SOF Operations Facility

ProjectTitle

Location: Hurlburt Field, Florida

Owner: U.S. Army Corps of Engineers

Cost: 6,680,000.00

Completed On: April 2008

Speegle Construction contracted with the USACE, Mobile District for the construction of a 21,000 square foot, two story facility. The building was constructed with a concrete foundation and large pre-cast concrete exterior wall panels for the main building. It included a mechanical yard, standing seam metal roof, fire protection/suppression/detection, HVAC, security, system, generator and UPS. The facility includes administrative areas, SCIF rated areas, utilities, and site improvements.

The project met all required compliance with DoD Force Protection standards and full environmental compliance for permitting by the State of Florida.

This was a LEED® Silver project.